Connect with us

Florida

Florida Republicans fulfill environmental promise made by Democrats decades ago

Published

 

on

Hands protect growing plants

Florida’s Everglades restoration gains ground

Florida’s Everglades restoration effort is producing measurable gains after decades of work by state and federal governments, farmers, engineers, environmental groups, and local communities. Recent milestones include major phosphorus reductions in agricultural runoff and an accelerated construction schedule for the Everglades Agricultural Area Reservoir.

The effort has crossed party lines for decades. The Everglades Forever Act became law under Democratic Gov. Lawton Chiles, while the modern federal-state restoration partnership took shape under President Bill Clinton and Republican Gov. Jeb Bush. Major ecological, financial, and infrastructure challenges remain.

Democrat party symbol

The Democratic-era law began decades ago

Florida’s last elected Democratic governor, Lawton Chiles, signed the Everglades Forever Act in 1994. The law established a long-term framework for reducing phosphorus pollution, improving water quality and implementing restoration measures across the Everglades.

The legislation required best management practices in the Everglades Agricultural Area, including a basin-wide goal of reducing phosphorus loads by at least 25% from the historical baseline. It also established a foundation for stormwater treatment, water-quality standards, and continuing restoration work.

Everglades National Park in Florida

Why the Everglades needed intervention

The Everglades is a subtropical wetland network that once covered a much larger area than it does today. Federal water projects, flood-control infrastructure, agriculture, and urban runoff disrupted natural flows, shrinking the ecosystem to approximately half its historical size.

The damage threatened more than wildlife. Altered water movement affected communities, farms, wetlands, coastal habitats, and drinking-water supplies, creating a difficult policy challenge: Florida needed to support growth while repairing an ecological system already reshaped by human decisions.

A stack of dollar bills.

A restoration plan crossed party lines

Congress authorized the Comprehensive Everglades Restoration Plan in 2000 through the Water Resources Development Act. CERP created a federal-state framework to improve the quantity, quality, timing, and distribution of water across the South Florida ecosystem.

The original plan envisioned more than 50 projects over about 30 years and was estimated to cost $8.2 billion in FY2000 dollars. The latest report cited by the Congressional Research Service projects implementation over roughly 50 years at $23.2 billion in FY2020 dollars, reflecting inflation, schedule changes, expanded project scope and additional authorizations.

Child reach out waiting for water, Water shortage concept.

Water quality became the measurable test

Phosphorus reduction offers one of the clearest ways to evaluate progress. Excess phosphorus can damage the Everglades’ natural balance, so Florida established a stringent water-quality criterion of 10 parts per billion within the protected ecosystem.

The state’s agricultural benchmark required a 25% reduction in phosphorus loads. Because the target produces a comparable year-to-year measurement, officials can evaluate restoration through data rather than relying only on speeches, campaign promises, or broad conservation claims.

Farmer stands on his land watching the irrigation process.

Farmers delivered a striking result

During Water Year 2026, farmers in the Everglades Agricultural Area achieved a 65% phosphorus reduction. That result nearly tripled the 25% reduction required under the Everglades Forever Act, according to information presented by the South Florida Water Management District.

Growers reportedly exceeded the benchmark every year since 1996, averaging a 57% annual reduction over three decades. Since that year, agricultural practices have prevented approximately 5,111 metric tons of phosphorus from moving south toward the Everglades.

Aerial view of a modern irrigation system watering crops in a field.

Technology helped improve water quality

Farmers in the Everglades Agricultural Area use required best-management practices that include nutrient management, water control, and sediment-reduction measures. These on-farm practices helped the basin achieve a 65% phosphorus-load reduction in Water Year 2026.

After water leaves the agricultural area, state-operated Stormwater Treatment Areas provide another layer of treatment before water reaches protected portions of the Everglades. Together, source controls and treatment infrastructure have improved water quality, although phosphorus reduction is only one measure of the much larger restoration effort.

Governor Ron DeSantis at a TPUSA event.

The reservoir became the centerpiece

Gov. Ron DeSantis has promoted the Everglades Agricultural Area Reservoir as a central restoration project. The roughly $3.5 billion project is designed to capture, store, treat and move water from Lake Okeechobee south toward the central and southern Everglades.

DeSantis has called it the “crown jewel of Everglades restoration.” Under expanded state-federal cooperation, the U.S. Army Corps of Engineers now targets completion in 2029, five years earlier than the previous 2034 schedule. Federal officials said in April that the necessary federally managed construction contracts were in place.

Money bag with dollar sign and stacks of metal coins

Spending turned plans into infrastructure

Florida’s enacted FY2026–27 budget includes $1.2 billion for Everglades restoration and water quality, including $665 million specifically for Everglades restoration. The budget also provides $150 million for Florida Forever land conservation, $425 million for rural and family land conservation easements, $63 million for state parks, and $64 million for beach nourishment.

Federal support remains essential. CERP is structured around an equal federal and nonfederal cost share, with Florida serving as the principal nonfederal partner through the South Florida Water Management District.

ottawa canada october 17 2024 Construction sign on the

The project is still far from finished

Everglades restoration remains a work in progress. The Comprehensive Everglades Restoration Plan includes numerous authorized and planned components, and the latest congressional research projects implementation over roughly 50 years from its 2000 authorization.

The estimated cost has also risen substantially. The latest report cited by the Congressional Research Service puts CERP at $23.2 billion in FY2020 dollars, reflecting inflation, expanded scope, schedule changes, and additional project authorizations. Funding cycles, construction requirements and scientific challenges will continue shaping the timeline.

Fun fact: The Republican Party symbol, the elephant, was popularized by cartoonist Thomas Nast in a 1874 Harper’s Weekly cartoon.

Democrat party and Republican party symbol on an American flag

Bipartisanship remains part of the story

Everglades restoration has involved cooperation across political parties and levels of government. The Clinton administration worked with Florida officials and other stakeholders on restoration in the 1990s, while Republican Gov. Jeb Bush supported the state’s financial commitment to CERP when Congress authorized the program in 2000.

Later state and federal administrations continued funding, authorizing and constructing restoration projects. The program’s long timeline means its progress has depended on continuity across multiple governors, presidents, legislatures, federal agencies, and local partners.

Discover why California refiners are warning that stricter climate rules could threaten the state’s remaining refineries and potentially put more pressure on fuel supplies and prices.

Two farmworkers picking strawberries in rows of crops on a farm.

Progress will be measured by what comes next

Florida has reached important Everglades restoration milestones, including substantial reductions in agricultural phosphorus runoff, major state and federal infrastructure investments and an accelerated schedule for the EAA Reservoir. Those gains build on policies and projects developed over several decades and multiple administrations.

Major tests remain. Florida and its federal partners still must complete key restoration projects, maintain water-quality improvements, protect remaining wetlands and sustain funding over the long term. The success of the restoration effort will ultimately depend on measurable ecological results rather than political claims.

Find out why California’s iconic Highway 1 is facing growing threats from coastal erosion, extreme weather, and other climate-related damage along the shoreline.

Do you think Florida should continue building on environmental policies proposed decades ago? Share your thoughts.

This slideshow was made with AI assistance and human editing.

Read More From This Brand:

John Ghost is a professional writer and SEO director. He graduated from Arizona State University with a BA in English (Writing, Rhetorics, and Literacies). As he prepares for graduate school to become an English professor, he writes weird fiction, plays his guitars, and enjoys spending time with his wife and daughters. He lives in the Valley of the Sun. Learn more about John on Muck Rack.

Trending Posts